If the landlord keeps stalling, do not hire someone, pay for the repair and knock it off next month's rent. Done too early, that step turns you into the party in arrears. Work out whose responsibility the repair is, send a written demand with a clear deadline, and get written consent before you repair and deduct. If nothing happens, negotiate a rent reduction, go to barangay conciliation, or leave on a properly documented basis.

First question: whose repair is it?

The landlord is responsible for what keeps the unit fit to live in. Damage you caused and minor day-to-day upkeep normally fall to the tenant.

The usual split runs like this. The landlord answers for structural problems and normal wear on fixtures that came with the unit: roof and wall leaks, main water and drainage lines, ageing wiring, and landlord-supplied appliances such as air conditioners, water heaters and refrigerators that fail without misuse. The tenant answers for damage through misuse, consumables and small jobs: light bulbs, cleaning air-conditioner filters, a drain you blocked yourself. Building management answers for common areas and shared lines, so a leak coming from above or from a pipe shaft goes to the management office, not only to your landlord.

The contract comes first. Many leases make the tenant responsible for minor repairs up to a stated limit, and some assign air-conditioner servicing to the tenant outright. Find the repairs clause and see which category your problem falls into. For how responsibility is worked out and whom to call, see the home repair guide.

If the water is coming from the unit upstairs, that is a different track with a different responsible party, covered in what to do when the unit above floods yours.

Getting this right matters because only a repair that is the landlord's responsibility gives you standing to demand it, to negotiate a deduction or to talk about ending the lease. If you are unsure which side of the line a fault falls on, ask the building engineer for a view before you write to anyone, because a demand aimed at the wrong party wastes weeks.

Fix the problem in evidence: photos, timeline and a third-party opinion

Before you demand anything, document the fault itself. Otherwise the dispute becomes one person's word against another's.

Photos and video of the fault, how far it extends and anything damaged by it, with dates. For a leak, capture the stain spreading over time. For an air conditioner, record it failing to cool or showing an error. The first report: note the day you first told the landlord and how, and screenshot every follow-up and every reply. That timeline is the backbone of the whole matter.

A third-party opinion carries real weight. Ask the building's engineering staff to inspect and issue a report, or have a reputable technician write a diagnosis and quotation stating whether the cause is wear or misuse. With that in hand it is difficult for the landlord to say you broke it.

Record your losses: what the delay has cost you, such as a hotel night, a fan or dehumidifier, furniture or electronics ruined by water. Keep the receipts. Not all of it will be recoverable, but it is leverage in negotiation.

Where safety is involved, such as sparking wires, a smell of gas or a bulging ceiling, cut the power or gas, get people away from the area and call management. That kind of problem is not something to leave waiting for the landlord's reply.

Store all of this in one place and in date order. When you later sit in front of a conciliator, being able to hand over a tidy bundle does half of the persuading for you, and it shows that you acted promptly.

The written demand: a deadline and a choice

When repeated verbal reminders have achieved nothing, send a formal written demand. Everything that follows depends on it.

It should make five points. One, what the fault is, when it was first reported and that it remains unrepaired. Two, that under the contract or the general rule this repair is the landlord's responsibility. Three, a clear and reasonable deadline, shorter for leaks and electrical faults than for an air conditioner. Four, a choice: the landlord sends someone, or consents in writing to you arranging the repair and deducting the receipted cost from the next rent. Five, what you will do if the deadline passes, such as seeking conciliation or asserting your rights.

Attach the management report or technician's diagnosis, send it by email or another channel that leaves a record, and ask for acknowledgment.

In practice the sentence that works best is the request for written consent to repair and deduct. Many landlords are not refusing so much as absent or unwilling to be bothered. Put a plan and a quotation in front of them, and a one-line reply saying yes solves the problem while giving you written authority for the deduction.

If you want more formal pressure, a lawyer can send the letter. What that achieves and how it is written is explained in how demand letters work.

Send the demand in English even if you and the landlord normally chat in another language, so that building staff, a conciliator or a judge can all read it later without translation, and keep a copy of exactly what was sent.

Repair and deduct: when it is safe and when it is a trap

A deduction made with the landlord's written consent is safe. A deduction made on your own initiative is high risk.

The law does give a tenant remedies when the landlord fails to make necessary repairs, including a reduction of rent, suspension of payment, carrying out urgent repairs or ending the lease. But those remedies come with conditions and room for argument, and the landlord's counter is simple: you paid less than the rent, so you are in arrears, and arrears support a demand, a termination and an action to remove you. At that point you are the one who has to prove the deduction was justified, at a cost far above the repair bill.

So think in three tiers. With written consent: go ahead, and keep the invoice, proof of payment and before-and-after photos, attaching a breakdown when you deduct. No reply but urgent, meaning continuing leaks, electrical faults or anything that will get worse: tell the landlord in writing that you are taking necessary emergency measures to prevent further loss, do only the minimum needed to contain the damage, record the cost separately and claim it later without deducting it from rent yourself. No reply and not urgent: do not repair and deduct. Continue with the demand and conciliation.

In every tier, keep the work within what is necessary, and do not use the occasion to upgrade equipment at the landlord's expense. If the landlord sues for unpaid rent, see what to do when a landlord sues before responding. It also helps to tell the landlord in advance which contractor you intend to use and what the quotation covers, so that there is no later argument about whether the price was reasonable.

Still no repair: rent reduction, conciliation or exit

Once the deadline has passed with no action, three routes are open, in rising order of cost to you.

Negotiate a rent reduction or compensation. When equipment is out of use for a long period the unit is worth less to you, and asking for a corresponding reduction is reasonable. Make it specific: a monthly figure until the repair is done, or a one-off credit afterwards. Record the agreement in an addendum.

Barangay conciliation. If you and the landlord live in the same city or municipality, bring the demand letter, photos and inspection report to the barangay. Conciliators often broker a repair deadline or a deduction arrangement on the spot and record it in a settlement. See how barangay conciliation works. For a defined money claim, small claims court is another option, described in how small claims court works.

Ending the lease for cause. If the unit can no longer be lived in normally and the landlord has ignored a proper demand, you have grounds to treat the landlord as in breach and ask for release and the return of your deposit. The bar is high. A broken air conditioner will not usually reach it, while persistent leaks and mould or a prolonged loss of water or power come closer. Have a lawyer review the notice before you send it. On the usual cost of leaving early, see what early move-out really costs.

If the defect goes back to how the developer built or delivered the unit, that is a matter between the owner and the developer and a tenant cannot pursue it directly. You can point the landlord to what owners can do about defects after turnover.

Do not let a repair dispute become a deposit dispute

Repair arguments tend to be settled when the deposit is calculated, so every record you keep now is protecting that deposit.

At move-out a landlord may describe the unrepaired fault as damage you caused and deduct for it. What defeats that is your report history, the demand letter and the third-party diagnosis, which together show the problem was already there, was not your doing and was reported promptly. The move-in inventory and photos matter just as much. If you never made one, photographs taken now are still better than nothing. The limits on deductions are explained in when a landlord will not return the deposit.

In your next lease, make repairs specific: which equipment the landlord maintains and replaces, how quickly a report must be answered, the tenant's right to repair and deduct after that period, and the limit for minor repairs. With those few lines in place, most of the trouble described here never arises. See what to lock down in a Philippine lease.

A related problem is the landlord who enters unannounced in the name of inspection or repair. That needs rules of its own, set out in when a landlord enters without notice.

If language is the obstacle, or you are unsure how to word a written notice or deal with the landlord and building management, send your contract and chat history to Yixing's settling-in advisors. We help you build the timeline, draft the notice, liaise with management and, where needed, accompany you to conciliation. Yixing is a Chinese-speaking consultancy in Makati (SEC registration CS202009551; Bureau of Immigration accreditation CA-202624381-1, valid to 30 June 2027; DOLE and PRA accredited), not affiliated with any government agency, and we do not promise any outcome. This article is not legal advice; consult a licensed lawyer about your own case.

Frequently Asked Questions

Can I pay for the repair and deduct it from rent?
With the landlord's written consent, yes, and keep the invoice and photos. Without it the risk is high, because the landlord can treat the shortfall as arrears. Send a written demand asking for consent first. In an emergency do only the minimum to stop the damage and claim the cost separately.
Who pays for repairs, landlord or tenant?
Structural problems and normal wear on fixtures supplied with the unit are generally the landlord's. Damage through misuse and minor upkeep are the tenant's. Common areas and shared lines belong to building management. The lease may vary this, so read the repairs clause.
Can I stop paying rent until it is fixed?
Not advisable. The law provides remedies, but their conditions are open to dispute and withholding is easily treated as arrears. A written demand, a negotiated reduction and conciliation are safer, with a lawyer's view before any stronger step.
The landlord keeps promising verbally and does nothing. What now?
Move to writing. Send a dated demand with a deadline, attach photos and a report from management or a technician, ask for acknowledgment, and offer two options: the landlord repairs, or consents to you repairing and deducting.
Is a broken air conditioner enough to end the lease?
Usually not. Ending a lease for cause generally requires that the unit can no longer be lived in normally and that a proper demand was ignored. Persistent leaks and mould or a long loss of water or power come closer.
The leak comes from upstairs. Do I still go to my landlord?
Tell management first so the source can be traced. If it comes from the unit above or a shared line, that owner or management is responsible. Inform your landlord in writing as well, since it is their property being damaged.
The landlord says I broke it and refuses. What can I do?
Get a written diagnosis from the building's engineering staff or a reputable technician stating whether the cause is wear or misuse, then send your demand. Move-in photos also show whether the problem was already there.
Share this guideFacebookXTelegramViberLINEWeiboLinkedIn

Let’s talk through your situation — free

Every company is different. Leave your details and a Chinese-speaking advisor will get back within 1 business day with practical, industry-specific guidance and a transparent quote.

Get help with Settling In → Free consultation