All guides YixingYixing · Business Landing
Settling In · Housing & Community

Condo Turnover Inspection: What to Check on Handover Day and What to Put in Writing

Updated 2026-09-19·6 min read·Settling In
Most people arrive at turnover thinking about keys and photographs. What actually decides the next six months is what you find in that hour, and how much of it you get onto paper before you sign.

Three things to settle before you go

Being rushed to sign while defects are only acknowledged verbally? → Have Yixing attend the inspection and file the list in writing

Confirm which document you will sign, since turnover and title transfer are different steps; see turnover to title transfer. Bring the plan and specification annex, a torch, a small plug-in appliance, a tape measure and something to write with. And book enough time, avoiding end-of-day or mass-turnover slots.

Inspect by system, not by room

  1. Doors, windows, locks — operation, seals, glass, key count.
  2. Walls, floors, ceilings, tiling — hollow spots, cracks, tolerance at wet-area junctions.
  3. Water — every tap, drainage at every outlet, a wet-area observation, and the meter reading.
  4. Electrical — every socket and switch, panel labelling, breakers, and the meter reading.
  5. Air conditioning and ventilation — cooling, condensate drainage, extraction.
  6. Kitchen, bathroom fittings and cabinetry — operation, joints, service provisions.
  7. Area and specification checked line by line against the contract annex.

Units are delivered bare or semi-furnished; the annex governs. See bare versus semi handover.

Write each defect as location, symptom, remedy

"Master bedroom, west wall, hollow tiling about a metre above floor level, to be repaired and re-inspected" is enforceable. "Wall has a problem" is not, and a photograph alone rarely is either.

Produce two copies, signed and timed by both sides. If the other side will receive but not sign, photograph the handover and resend the list the same day in writing, keeping proof of sending.

Also put in writing the rectification deadline and re-inspection, and what you are actually acknowledging — acceptance, or acceptance subject to listed items.

Meters, keys and access

Before leaving, record meter readings with photographs, count keys and access cards, confirm parking and storage identifiers, and note the maintenance reporting channel. Then move on to move-in permits, association dues and house rules and connecting utilities.

If the developer will not accept the list

Escalate internally first, in writing at every level, citing unit number, inspection date, the defect list and the remedy and deadline you require. If that fails, the housing and urban development authority has a complaint and adjudication route; see where to file a property complaint, and confirm current filing requirements first.

Either way, a complete written timeline usually matters more than the defect itself. Yixing (SEC CS202009551 · BI CA-202624381-1) can attend the inspection, compile the written list and follow up on rectification.

Buyer protection in presale and turnover derives largely from the Subdivision and Condominium Buyers' Protective Decree (Presidential Decree No. 957), with DHSUD assuming the former HLURB functions under Republic Act No. 11201. Filing requirements follow that agency's current issuances.

Frequently Asked Questions

What should I check at a condo turnover inspection?
Work by system rather than by room: doors, windows and locks; walls, floors, ceilings and tiling; water supply and drainage; electrical sockets, switches and the panel; air conditioning and ventilation; kitchen and bathroom fittings and cabinetry; then area and specification against the contract annex. Test every tap, socket and switch individually and photograph both meter readings before you leave.
How should defects be recorded?
Write each one as location, symptom and required remedy, produce two copies, and have both sides sign with the date and time. If the other side receives but will not sign, photograph the handover and resend the list the same day in writing while keeping proof of sending. Photographs without written descriptions, or verbal reports alone, are hard to rely on weeks later.
Should I sign the acceptance document if there are defects?
It depends what the document says. Before signing, confirm whether it records completed acceptance or acceptance subject to listed items, and attach the defect list with a rectification deadline and re-inspection arrangement. A demand that you sign unconditionally first and raise issues later is a reason to pause rather than a standard formality.
How much time should I allow?
Enough to work through every system without being hurried, and preferably not at the end of the day or during a mass turnover session, where careful inspection is impractical. Rescheduling is better than rushing. Bringing the plan and specification annex, a torch, a plug-in appliance, a tape measure and a notepad makes the visit considerably faster.
What if the developer refuses to rectify?
Escalate internally in writing through site staff, project management and the developer's formal customer channel, stating unit number, inspection date, the defect list and the remedy and deadline required. If that produces nothing, the housing and urban development authority offers a complaint and adjudication route; check current filing requirements before submitting. A complete written record usually influences the outcome more than the defect itself.
Share this guideFacebookXTelegramViberLINEWeiboLinkedIn

Let’s talk through your situation — free

Every company is different. Leave your details and a Chinese-speaking advisor will get back within 1 business day with practical, industry-specific guidance and a transparent quote.

Get help with Settling In → Free consultation